The acquisition of a co-ownership (copropriété) lot is still too often negotiated on the sole triptych of price per square metre, running charges and voted but unpaid works. The share of the works fund built up by the seller falls outside that grid: it is not reimbursed to the seller, it does not appear as a receivable in the statement of account (état daté), and it gives the buyer no individual right over cash that belongs to the co-ownership association (syndicat). Since the Climate and Resilience Law, this mechanism has become stricter: the works fund now falls under Article 14-2-1 of the Law of 10 July 1965, its minimum contributions are indexed to the multi-year works plan, and the collective energy performance certificate (DPE) determines the scale of future capex. This guide quantifies what the buyer actually inherits, identifies the documents that make it possible to measure it before the preliminary sale agreement (promesse), and sets out the apportionment clauses to negotiate in the deed.
The works fund is attached to the lot: immediate consequences for the buyer's assets
Paragraph III of Article 14-2-1 of the Law of 10 July 1965 is the text to read first on any acquisition.
The sums paid into the works fund are attached to the lots and become, from the time of payment, definitively part of the assets of the co-ownership association (syndicat des copropriétaires). They are not reimbursed by the association on the transfer of a lot. The buyer may agree to pay the seller an amount equivalent to those sums in addition to the sale price of the lot.
Three legal effects overlap. First, the transfer of ownership to the association is immediate and definitive: the co-owner who contributes does not hold a refundable deposit but funds a collective asset. Second, attachment to the lot means that the share built up follows the building and benefits the new holder of the lot, without any transfer instrument or formality. Third, the association reimburses nothing to the seller, whatever the length of holding and whatever the amount accumulated.
The expression "attached to the lot" therefore does not create a right of claim in favour of the buyer. It describes an apportionment key mechanism: the share of the fund attached to the lot is an accounting indicator, not a realisable asset. The buyer can neither ask for its return, nor apply it freely, nor set it against a later call for funds. The buyer benefits only from the fact that this reserve, allocated to the expenses exhaustively listed in paragraph I of Article 14-2-1, will reduce future calls by the same amount if the general meeting decides to use it.
What the buyer actually inherits
Paragraph I of Article 14-2-1 confines the use of the fund to four items: preparation of the draft multi-year works plan and, where applicable, of the global technical diagnostic; carrying out of the works provided for in the adopted multi-year works plan; works decided by the property manager (syndic) in an emergency; and works necessary for the preservation of the building, for the protection of the health and safety of the occupants and for energy savings, not provided for in the plan.
Allocation of all or part of the sums to these expenses requires a vote of the general meeting, by the same majority as that applicable to the expenses concerned, and must take account of the existence of special common areas or of charge apportionment keys. In other words, a well-funded reserve does not guarantee that the buyer will benefit from it: the expense must also fall within its scope of allocation, the meeting must vote the allocation, and the lot acquired must actually be concerned by the apportionment key adopted. An investor holding ground-floor commercial lots, attached to special common areas, must check this point before placing a value on the reserve.
Why the reference to the "ALUR Law works fund" is now misleading
The works fund originated in the ALUR Law of 24 March 2014, which had placed it in paragraph II of Article 14-2 of the 1965 Law. That location is no longer correct. Article 171 of Law No. 2021-1104 of 22 August 2021 on combating climate change and strengthening resilience to its effects created an Article 14-2-1 dedicated to the works fund, and redeployed Article 14-2 solely to the multi-year works plan. Any deed clause, any due diligence note or any template for a preliminary sale agreement that still refers to "Article 14-2 II" for the works fund rests on a repealed text.
The change is not merely formal. Three parameters have been modified.
- The period for establishing the fund: the fund is established "at the end of a period of ten years from the date of acceptance of the construction works of the building", and no longer five years as under the earlier wording.
- The exemptions: the former regime allowed the fund to be dispensed with, in buildings of fewer than ten lots, by unanimous decision, and provided for an exemption where a global technical diagnostic revealed no need for works. The Article 14-2-1 in force retains neither. The only exemption remaining today in connection with the global technical diagnostic (DTG) concerns the preparation of the draft multi-year works plan, where that diagnostic reveals no need for works in the ten years following its preparation.
- The method of calculating the contribution, now tied to the multi-year works plan.
The timetable for entry into force, set in paragraph VI of Article 171, applied in stages: 1 January 2023 for associations comprising more than two hundred lots used for housing, offices or shops; 1 January 2024 for those comprising between fifty-one and two hundred lots; 1 January 2025 for those comprising no more than fifty lots. Paragraph VII postponed by one year the entry into force of point 4° of paragraph II of Article 171, that is 2024, 2025 and 2026 on the same size scale. As at 20 November 2026, the regime is fully applicable. This sequencing remains useful in due diligence: a small co-ownership has been subject to the new regime only for a recent period, which explains the delays in adopting the plan and funds that are still thinly endowed.
Quantifying the contribution: the minimums in Article 14-2-1 and their tipping effect
The fund is fed by a mandatory annual contribution. Each co-owner contributes to it "on the same terms as those decided by the general meeting for the payment of the advances of the forecast budget". The buyer must therefore anticipate an additional call tied to the rhythm of the calls for advances, quarterly in most associations.
The amount is governed by two distinct regimes, which must be carefully distinguished.
- Where no multi-year works plan has been adopted, "the amount of the annual contribution may not be less than 5% of the forecast budget" of Article 14-1.
- Where the general meeting has adopted the multi-year works plan referred to in Article 14-2, "the amount of the annual contribution may not be less than 2.5% of the amount of the works provided for in the adopted plan and 5% of the forecast budget". The two minimums are cumulative: the higher one governs.
The general meeting, voting by the majority of the votes of all co-owners, may decide on a higher amount.
The tipping effect is decisive for a buyer. As long as no plan has been adopted, the contribution is indexed to the operating budget, and therefore to a modest order of magnitude. The day the meeting adopts a plan covering renovation of the building envelope, the boiler room or the window joinery, the 2.5% minimum on the cost of the programme becomes, in most configurations, far higher than 5% of the forecast budget. The annual cost of holding the lot then changes in nature, before any works contract has yet been signed.
That is why the analysis of a lot should not focus on the amount of the fund built up, which is an inherited, unrecoverable stock, but on the future flow of contributions that the probable adoption of the plan will trigger. A well-funded reserve in a co-ownership that has not yet adopted its plan is not good news: it often signals that the programme still lies ahead.
Suspension of contributions is never automatic
Paragraph II of Article 14-2-1 provides that the general meeting "rules on the question of suspending contributions to the works fund" where its amount exceeds that of the forecast budget. Where a multi-year works plan has been adopted, it rules on that suspension where the amount of the fund also exceeds 50% of the amount of the works provided for in the adopted plan.
The text requires a deliberation, not a result. A co-ownership whose fund has exceeded these thresholds may perfectly well decide to continue the payments. A buyer who reasons on the basis of an automatic end to the contribution misreads the text.
The multi-year works plan: the real valuation document
Article 14-2 requires, "on expiry of a period of fifteen years from the date of acceptance of the construction works of the building", the preparation of a draft multi-year works plan in buildings used wholly or partly for housing. It is updated every ten years.
The content is standardised and directly usable in investment analysis: list of the works necessary for the preservation of the building, for the protection of the health and safety of the occupants, for energy savings and for the reduction of greenhouse gas emissions; estimate of the performance level within the meaning of Article L. 173-1-1 of the French Construction and Housing Code that those works make it possible to reach; summary estimate of the cost of those works and their prioritisation; proposed schedule for the works whose completion appears necessary in the next ten years. The significance of the multi-year works plan and the DTG for the buyer of an income-producing building is dealt with separately in our article on what the buyer inherits at closing.
The draft is prepared on the basis of an analysis of the structure and equipment, of the collective DPE provided for in Article L. 126-31 of the same Code, unless the exemption provided for in the second paragraph of that article applies, and, where applicable, of the global technical diagnostic under Article L. 731-1 where one has been carried out.
The decision process and its bottlenecks
The arrangements for preparing the draft are voted by the majority of the votes cast by the co-owners present, represented or having voted by post. Adoption of all or part of the draft, however, requires the majority of the votes of all co-owners, a more demanding rule. Where the draft shows that works need to be carried out in the next ten years, the property manager places the question of adoption on the agenda of the first meeting following its preparation, then, as long as the plan has not been adopted, on the agenda of each meeting called to approve the accounts.
For a buyer, reading the minutes of the last three meetings becomes an exercise in forecasting: an adoption question put off year after year indicates a co-ownership that has not yet absorbed the contribution shock, and whose investment backlog will be passed on to the next holder.
Paragraph III of Article 14-2 adds an administrative lever. Within the framework of the police powers on the safety and sanitation of buildings, the competent administrative authority may ask the property manager to send it the adopted plan. Failing transmission within one month of notification of the request, or if the plan sent manifestly does not prescribe the works necessary to preserve the safety of the occupants, the authority may prepare or update the draft of its own motion, in place of the association and at the association's expense. The exposure is therefore not only financial, it is also regulatory.
Collective DPE and energy capex: measuring under-provisioning
Article L. 126-31 of the French Construction and Housing Code, in the version resulting from Law No. 2026-403 of 26 May 2026, provides that every multi-occupancy residential building whose building permit application was filed before 1 January 2013 must have an energy performance certificate carried out under the conditions provided for in Article L. 126-26, renewed or updated every ten years, except where a certificate carried out after 1 July 2021 establishes that the building falls in class A, B or C.
It was applied in stages, under paragraph VI of Article 158 of Law No. 2021-1104: 1 January 2024, with a derogation to 1 January 2025 for co-ownerships comprising between fifty and two hundred lots and to 1 January 2026 for those with no more than fifty lots; in the overseas territories, these provisions enter into force on 1 January 2028.
The way these elements fit together is the key to the analysis. The collective DPE feeds the draft plan, the plan fixes the cost estimate and the schedule, and the adopted plan governs the 2.5% minimum contribution. A co-ownership ranked at the bottom of the scale on its collective DPE is therefore a co-ownership whose contribution to the works fund will mechanically rise as soon as the plan is adopted, and whose specific calls for funds will then take over when the fund, sized on a percentage of the programme, proves insufficient to cover it. On the collective DPE and the energy audit as conditions for the operability of an income-producing building, see our dedicated analysis.
The classic analytical error is to treat the share of the works fund attached to the lot as a provision covering energy capex. The statutory minimum of 2.5% of the amount of the works provided for in the plan means, by construction, that only a fraction of the programme will be pre-funded by the fund at the end of the ten-year schedule. The balance depends on calls for funds, a collective loan or a decision to sell.
Pre-contractual information: the documents that make quantification possible
Paragraph II of Article L. 721-2 of the French Construction and Housing Code requires, in the case of a preliminary sale agreement and no later than the date of its signature, delivery to the buyer of a set of documents, three items of which bear directly on the subject.
- Point d) of 2°: where the association has a works fund, the amount of the share of the works fund attached to the main lot sold and the amount of the last contribution to the fund paid by the selling co-owner in respect of the lot.
- Point 6°: the multi-year works plan adopted under the conditions provided for in the first paragraph of paragraph II of Article 14-2 of the 1965 Law.
- Point 7°: failing an adopted plan, the draft multi-year works plan if one has been prepared.
The information referred to in points a, c and d of 2° is up to date as at the information submitted to the annual general meeting called to approve the accounts preceding signature of the preliminary sale agreement. This time lag is a point for vigilance: the share communicated reflects the position fixed at the last approved financial year, not the position on the day of signature of the notarised deed (acte authentique). In between, a meeting may have allocated all or part of the fund to an expense, or decided on a higher contribution.
Two exceptions deserve attention in investment practice. The documents referred to in 1° and 3° to 7° are not required where the buyer already owns at least one lot in the same co-ownership, a frequent configuration in building reorganisation strategies. The documents referred to in c of 1° and in 3° to 7° are not required in the case of the sale of an ancillary lot, the text citing in particular the parking space, the cellar, the attic, the storeroom, the cupboard, the outbuilding, the garage or the pantry. A buyer exempted by law is not thereby informed: it is for the buyer to request the documents contractually.
Finally, where the notarised deed is not preceded by a preliminary sale agreement, the documents referred to in 1°, in c of 2° and in 3° to 7° are attached to the draft deed notified or delivered to the buyer. In the case of a public sale, the documents and information referred to in 1° to 7° are annexed to the specification of terms (cahier des charges), which makes it compulsory reading for any operator positioned on assets sold at auction.
The statement of account (état daté) does not return the works fund
A persistent confusion leads some sellers to claim, through the statement of account, the return of their share. Article 5 of Decree No. 67-223 of 17 March 1967, in the version resulting from Decree No. 2025-1292 of 22 December 2025, does not allow it.
The first part of the statement of account lists the sums that may remain owing to the association by the selling co-owner, namely the advances falling due under the forecast budget, the advances falling due for expenses not included in that budget, unpaid charges for earlier financial years, the sums referred to in Article 33 of the 1965 Law, advances falling due, and, since the latest amendment, the amount remaining owing by the selling co-owner who takes part in the loan taken out under Article 26-4 of the 1965 Law and the amount paid by the guarantee institution referred to in Articles 26-7 and 26-12 where the seller defaults on repayment of that loan. These last two lines must be systematically examined in a co-ownership that has financed its renovation by a collective loan.
The second part lists the sums of which the association might be debtor to the seller, limited to the advances referred to in Article 45-1 of the decree and to the advances for later periods made payable by acceleration under Article 19-2 of the Law. The third part lists the sums falling to the new co-owner: replenishment of the advances under Article 45-1, advances not yet due under the forecast budget, advances not yet due for expenses outside the forecast budget.
None of these headings provides for reimbursement of the share of the works fund. The distinction between an advance, which is a refundable sum shown in the statement of account, and a contribution to the works fund, which becomes definitively part of the association's assets, must be kept precisely in exchanges between advisers. The content of the pre-statement and the statement of account, and their impact on the apportionment of charges on the sale of a lot, is set out in our article devoted to those documents.
The apportionment clauses to negotiate in the deed
The last sentence of paragraph III of Article 14-2-1 opens the only workable route: The buyer may agree to pay the seller an amount equivalent to those sums in addition to the sale price of the lot. The text recognises a contractual option, it creates no obligation and sets no valuation method. The apportionment is therefore a pure matter of economic negotiation, and how it is drafted binds the parties.
Several reflexes are needed on the buyer's side.
- Refuse any clause that presents the payment as a due or that describes the share as a claim of the seller. The statutory wording is that of the buyer's consent to a payment in addition to the price.
- Tie any amount to the figure communicated under point d) of 2° of Article L. 721-2, and specify the cut-off date adopted, bearing in mind that this information is up to date as at the last approved financial year.
- Provide for the fate of allocations decided between the preliminary sale agreement and completion: if a meeting allocates all or part of the fund to an expense, the reserve from which the buyer benefits falls by the same amount, and the additional price agreed must be adjusted or become void.
- Deal separately with the contribution itself, which follows the arrangements for paying the advances of the forecast budget, and organise contractually the apportionment of calls between seller and buyer according to the date of transfer of ownership.
- Provide for the case where adoption of the multi-year works plan or a vote on a higher contribution takes place between the preliminary sale agreement and the notarised deed, by providing either for immediate notice to the seller, or a revision mechanism, or a condition precedent where the scale of the programme is liable to alter the balance of the transaction.
For a block acquisition, a division of lots or a contribution in kind, the texts read do not settle the fate of the share attached to the lots concerned. Prudence requires having the property manager confirm, before signature, the lot-by-lot breakdown adopted.
Conclusion
The works fund is not an acquired asset, it is an inherited constraint. The buyer pays, if the buyer accepts an additional price, for cash that will never belong to the buyer, allocated to expenses that the buyer does not decide alone, and whose use depends on a vote of the meeting. In return, the buyer bears from the transfer of ownership a contribution whose statutory minimum will shift from 5% of the forecast budget to 2.5% of the amount of the works in the plan on the day the plan is adopted. In an older co-ownership subject to the collective DPE, this shift is not a hypothesis, it is a timetable.
The position to take is simple: refuse to value the stock and require documentation of the flow. Before any preliminary sale agreement, request the draft multi-year works plan or the adopted plan, the collective DPE, the last three sets of minutes and the share of the fund attached to the lot, then have your adviser reconstruct the forecast contribution over ten years from the minimums in Article 14-2-1. That figure, and not the amount accumulated by the seller, is the parameter that should go into the price.
Frequently asked questions
Can the seller recover their share of the works fund on the sale?
No, not from the association. Paragraph III of Article 14-2-1 of the Law of 10 July 1965 states that the sums paid become definitively part of the assets of the co-ownership association from the time of payment and are not reimbursed on the transfer of a lot. The only route open is contractual: the same text provides that the buyer may agree to pay the seller an equivalent amount in addition to the sale price. This option requires an agreement, it is neither a right of the seller nor an obligation of the buyer.
What is the minimum contribution to the works fund in 2026?
Two minimums coexist under Article 14-2-1 I. Where no multi-year works plan has been adopted, the annual contribution may not be less than 5% of the forecast budget under Article 14-1. Where the meeting has adopted a plan, it may not be less than 2.5% of the amount of the works provided for in the adopted plan and 5% of the forecast budget, the two conditions being cumulative. The general meeting, voting by the majority of the votes of all co-owners, may set a higher amount.
From when must a co-ownership establish a works fund?
The association establishes the fund at the end of a period of ten years from the date of acceptance of the construction works of the building, in accordance with paragraph I of Article 14-2-1. The five-year period still found in many templates corresponds to the former wording of Article 14-2 II resulting from the ALUR Law, replaced by Article 171 of Law No. 2021-1104 of 22 August 2021. The new regime applied in stages, on 1 January 2023, 2024 and then 2025 according to whether the association comprises more than two hundred lots, fifty-one to two hundred lots, or no more than fifty lots.
Can a small co-ownership of fewer than ten lots be exempted from a works fund?
The Article 14-2-1 in force provides neither for an exemption by unanimous decision in buildings of fewer than ten lots, nor for an exemption based on a global technical diagnostic revealing no need for works. Those exceptions appeared in the former Article 14-2 and were not carried over. The only exemption now linked to the global technical diagnostic concerns the preparation of the draft multi-year works plan, where that diagnostic reveals no need for works in the ten years following its preparation.
Does the contribution stop automatically when the fund reaches a certain level?
No. Paragraph II of Article 14-2-1 provides that the general meeting rules on the question of suspending contributions where the amount of the fund exceeds that of the forecast budget and, where a multi-year works plan has been adopted, where it also exceeds 50% of the amount of the works provided for in the plan. The text requires a deliberation, not an end as of right. The meeting may decide to maintain the payments.
What documents on the works fund and the multi-year works plan must be delivered before the preliminary sale agreement?
Paragraph II of Article L. 721-2 of the French Construction and Housing Code requires delivery, no later than the date of signature of the preliminary sale agreement, of the amount of the share of the works fund attached to the main lot sold and of the amount of the last contribution paid by the seller, together with the adopted multi-year works plan or, failing that, the draft plan if one has been prepared. This information is up to date as at that submitted to the general meeting approving the accounts preceding the agreement. The documents are not required where the buyer already owns at least one lot in the same co-ownership, nor for the sale of an ancillary lot such as a parking space, a cellar or a garage.
Does the statement of account (état daté) mention the seller's share of the works fund?
Article 5 of Decree No. 67-223 of 17 March 1967, in the version resulting from Decree No. 2025-1292 of 22 December 2025, contains no heading for reimbursement of the share of the works fund, either in the list of sums owed by the seller or in that of the sums of which the association might be debtor to the seller. The statement of account lists in particular advances falling due, unpaid charges, advances falling due and, since the latest reform, the amount remaining owing under a collective loan under Article 26-4 of the 1965 Law. Information on the share of the fund attached to the lot comes under point d) of 2° of Article L. 721-2 of the French Construction and Housing Code, for information purposes only.
The simulator below tells you, from the date of acceptance of the works, which guarantee covers your defect and until when you can act.
Quatre questions suffisent à situer votre position, le délai qui vous reste et ce qu'il faut vérifier en priorité. Vous décidez ensuite si vous en parlez au cabinet.
Décrire ma situationA defect discovered after the sale?
The time limit for taking action runs not from the sale but from the discovery of the defect, and it is shorter than people think.