Pre-letting determines the financing, the exit valuation and the opening timetable of an asset that is still under construction. The lender requires a level of letting commitments before drawdown, the investor wants to secure a headline rent before delivery, and the retailer refuses to sign a binding lease on premises that do not yet exist. The promise to grant a commercial lease (promesse de bail commercial) is the instrument for this interim period. It must nonetheless be genuinely binding: a promise riddled with purely potestative conditions precedent has no value before a court, and a landlord who withdraws during the option period cannot free itself by paying damages. This guide covers the conditions precedent that can genuinely be enforced, the sanction for refusing to complete, the choice between specific performance and compensation, and how the promise fits with the asset's delivery timetable.

What the agreement to lease binds the parties to, and what it does not

Three instruments are in circulation in pre-letting, and they produce radically different effects. Confusing them is costly.

The non-binding letter of intent falls within pre-contractual negotiations. Article 1112 of the French Civil Code states that "the initiative, conduct and breaking off of pre-contractual negotiations are free", subject to good faith. Above all, in the version resulting from Law No. 2018-287 of 20 April 2018, that provision closes the door to compensation for loss of profit:

"Where a fault is committed in negotiations, the reparation of the resulting loss may not be aimed at compensating either the loss of the benefits expected from the contract that was not concluded, or the loss of a chance of obtaining those benefits."

In other words, a landlord whose retailer withdraws after ten months of discussions will recover neither the rent it hoped for nor the chance of receiving it. At best it will recover the costs incurred, if a fault is established. That is the first economic argument in favour of a genuine promise.

The time-limited offer to lease, the second instrument, is stronger but remains fragile. Article 1116 provides that withdrawal of the offer before the expiry of the stated period "prevents the conclusion of the contract" and gives rise only to non-contractual liability, "without obliging the offeror to compensate the loss of the benefits expected from the contract". A withdrawn offer therefore never turns into a lease, even if it was irrevocable. The recipient of an offer has no lever for specific performance.

The unilateral promise, the third instrument, changes the balance of power. Article 1124 defines it as "the contract by which one party, the promisor, grants to the other, the beneficiary, the right to opt for the conclusion of a contract whose essential terms are determined, and for the formation of which only the beneficiary's consent is lacking". Two decisive consequences attach to it, set out below.

As for the bilateral agreement to lease (promesse synallagmatique de bail), by which both parties commit definitively, no provision of the Civil Code settles whether it amounts to a lease from signature. The answer rests on case law and must be checked case by case. In practice, the choice between a unilateral and a bilateral promise is not neutral: the first leaves the beneficiary an option and gives it the protection of Article 1124; the second binds both parties but carries the risk of immediate requalification as a lease, with early entry into the regime of delivery. The mechanisms of formation and performance specific to each of these two forms are compared in our article on the bilateral and unilateral promise of sale.

The essential terms to be determined from the outset

Article 1124 requires that the essential terms of the promised contract be determined. A promise to lease that leaves the setting of the rent or the description of the premises to later negotiation is not a promise: it is an agreement in principle.

In the pre-letting of an undelivered asset, determination means annexing a complete, initialled draft lease, together with the plans, the contractual area and the method of measurement, the technical description of delivery (shell condition, fitted-out delivery, items at the landlord's cost), and the schedule allocating works between landlord and tenant. The rent must be expressed with its basis of calculation and its indexation; the rent-free period, the financial support and the contribution to the tenant's works must be included, failing which completion becomes a negotiation again.

Term and payment frequency: the mandatory points to settle in advance

Article L. 145-4 of the French Commercial Code sets the minimum term: "The term of the lease may not be less than nine years", the tenant having a right to give notice at the end of each three-year period, "at least six months in advance, by registered letter with acknowledgement of receipt or by extrajudicial act". The same provision permits contrary stipulations for four categories that cover most pre-let assets: leases concluded for a term of more than nine years, leases of premises built for a single use, leases of premises used exclusively as offices, and leases of storage premises referred to in 3° of III of Article 231 ter of the French General Tax Code. An institutional landlord pre-letting a new office building or a single-purpose building can therefore neutralise the three-year break rights, provided that the classification of the premises is beyond dispute on the date of delivery.

Since Law No. 2026-403 of 26 May 2026, Article L. 145-32-1 of the French Commercial Code makes monthly payment of rent a right "where the tenant of premises intended for a retail or wholesale business, or for commercial or craft services, so requests, provided that there are no arrears in the payment of sums due in respect of rent and charges that have not previously been disputed", the request taking effect at the next due date. Article L. 145-15, in the version in force since 28 May 2026, now includes L. 145-32-1 in the list of provisions that no clause may defeat, on pain of being deemed not written. The operational consequence for commercial assets is that the quarter in advance stipulated in the draft lease annexed to the promise can no longer be presented as fixed, and cash-flow models built on quarterly payment must be adjusted before they are presented to the lender.

Scope of the statute and timing of entry into the premises

Article L. 145-1 makes application of the statute subject to the existence of a business operated on the premises, by a trader or industrial operator registered with the commercial and companies register, or by the head of a business in the trades and crafts sector registered with the national business register. The version resulting from Order No. 2021-1189 of 15 September 2021, in force since 1 January 2023, does refer to the national business register, and no longer to the trades register.

In pre-letting, the tenant signs the promise before any trading and often before registration, sometimes through a company in formation. The point in time at which these conditions are assessed is a matter for case law and must be examined case by case. A drafting precaution: name the tenant precisely, provide for a framed substitution clause, and make completion conditional on evidence of registration and of the operating authorisations.

The conditions precedent that can genuinely be enforced

This is where the economic value of the promise is decided. A badly drafted condition precedent does not delay the commitment: it destroys it.

Article 1304 defines a condition precedent as a "future and uncertain event" whose "fulfilment makes the obligation unconditional". Two provisions govern its enforceability.

The bar on potestative conditions

Article 1304-2 provides:

"An obligation contracted under a condition whose fulfilment depends solely on the will of the debtor is void. That nullity may not be invoked where the obligation has been performed with knowledge of the position."

Exposed to nullity are therefore the "in-house" conditions commonly found in pre-letting promises: approval by the landlord's investment committee, validation by the retailer's board of directors, achievement of a pre-letting level assessed at the developer's discretion, approval of the architectural concept "to the landlord's satisfaction". Each amounts to making the commitment subject to the will of the person who gives it.

The answer is not to remove these conditions but to make them objective: express the pre-letting threshold as a percentage of lettable area let by a long-stop date and on the basis of signed leases or promises, define the concept by an annexed and verifiable specification, and replace the approval of an internal body with a condition relating to an external event (obtaining financing on stated terms, obtaining an identified administrative authorisation).

The condition deemed fulfilled

Article 1304-3 completes the scheme: "A condition precedent is deemed fulfilled if the party who had an interest in it has prevented its fulfilment." This is the beneficiary's weapon against a promisor who deliberately lets the condition fail: a developer who does not file the authorisation application, a landlord who never applies for its financing, a tenant who does not put together its operating authorisation file.

It must still be possible to prove it. The promise must therefore convert each condition into a dated duty of diligence: who files what, within what period from signature, with what obligation to inform the other party periodically and what supporting documents to produce. Without this mechanism, Article 1304-3 remains theoretical. With it, the failure of the condition becomes a documented breach of contract, and Article 1104, a mandatory provision, which requires contracts to be "negotiated, formed and performed in good faith", takes on practical force.

Waiver and effects: two timing traps

Article 1304-4 allows a party to waive a condition stipulated for its exclusive benefit, "as long as it has not been fulfilled or has not failed". The words added by the Law of 20 April 2018 are decisive: once the condition has failed, waiver is no longer possible. A landlord who, on learning that financing has been refused, wished to waive the following week the financing condition stipulated for its benefit would be too late. The promise must therefore identify, condition by condition, the exclusive beneficiary and the waiver period, that period expiring before the date of failure.

Article 1304-6 governs the effects. "The obligation becomes unconditional from the fulfilment of the condition precedent", retroactivity existing only if the parties have expressly provided for it. The earlier rule of retroactivity as a matter of principle did not survive the 2016 Order. If the parties want the effective date of the lease, the indexation or the start of the rent-free period to go back to the date of the promise, the clause must say so. In the event of failure, "the obligation is deemed never to have existed": no compensation is due under the contract, unless there is a specific stipulation covering costs incurred.

Fitting the promise to the delivery timetable

The pre-letting promise is a contract with a time element as much as a conditional contract. It must describe a chronology, not merely a commitment.

Three dates structure the arrangement: the forecast completion date, the actual delivery date recorded by both parties, and the window for completing the lease that opens from that delivery. To these dates is added a long-stop date beyond which the promise lapses, each party regaining its freedom. Without a long-stop date, the developer remains bound indefinitely to a rent negotiated in market conditions that have since changed.

Completion must be defined contractually by reference to verifiable elements (acceptance report, lifting of reservations affecting operation, obtaining of regulatory certificates of compliance), and not by the sole declaration of the project owner, which would bring the condition back within the scope of Article 1304-2.

The promise must also organise what happens on the day of taking possession. Article L. 145-40-1 of the French Commercial Code requires a joint inventory of condition "on the tenant's taking possession of the premises where a lease is concluded", failing which it is drawn up by a commissaire de justice (bailiff) at the instigation of the more diligent party, "at costs shared equally between landlord and tenant". The sanction is blunt for the landlord: "A landlord who has not taken all steps to have the inventory of condition drawn up may not rely on the presumption of Article 1731 of the Civil Code." On a new asset delivered in shell condition and then fitted out by the tenant, losing that presumption at the end of the lease represents a risk of reinstatement that cannot be quantified. The exact scope of this sanction and the conduct of the entry inventory are dealt with separately in our article on the inventory of condition in a commercial lease.

Article L. 145-40-2 also requires, on conclusion of the contract, a precise and exhaustive inventory of the categories of charges, taxes, duties and fees with their allocation, together with a forecast statement of the works planned in the following three years accompanied by a budget, and a summary statement of the works carried out in the previous three years with their cost. These annexes are prepared at the time of the promise, not on the eve of signature: in a new property complex with several tenants, the allocation key, based on the area occupied, must be settled before it is applied to the first tenant to sign.

Late delivery: characterise before sanctioning

Construction delay is the main uncertainty. The obligation of delivery under Article 1719, 1° of the Civil Code arises only with the lease; before completion, the breach is analysed by reference to the commitments given in the promise itself.

Article 1217 opens a range of sanctions, including suspension of performance of one's own obligation, specific performance, termination and compensation, specifying that "sanctions that are not incompatible may be combined; damages may always be added to them". Termination results, under Article 1224, either from a termination clause or, in the event of sufficiently serious non-performance, from notice given by the creditor to the debtor or from a court decision. Damages are due, under Article 1231-1, by reason of non-performance or delay, unless the debtor justifies an impediment by force majeure.

Force majeure, defined in Article 1218, requires an event beyond the debtor's control, which could not reasonably have been foreseen when the contract was concluded and whose effects cannot be avoided by appropriate measures. If the impediment is temporary, performance is suspended, unless the delay justifies termination; if it is permanent, the contract is terminated by operation of law. Clauses extending time for bad weather, shortages or third-party challenges must be drafted with this provision in mind: the more they anticipate the event, the less unforeseeable it is within the meaning of Article 1218.

Finally, fixed late-payment penalties fall under Article 1231-5. The judge may, "even of its own motion, moderate or increase the penalty thus agreed if it is manifestly excessive or derisory", and reduce it in the event of partial performance, "any stipulation contrary to the two preceding paragraphs being deemed not written". One last point, often overlooked in practice: "save in the case of definitive non-performance, the penalty is incurred only when the debtor has been served with a formal notice". A daily penalty not preceded by a formal notice (mise en demeure) is open to challenge on its very principle.

Sanction for refusing to complete: specific performance or compensation

The scenario to anticipate is that of the promisor who, the market having turned, refuses to sign the promised lease.

The rule in Article 1124

For the unilateral promise, Order No. 2016-131 of 10 February 2016 broke with the earlier rule. Since 1 October 2016, Article 1124 provides that "revocation of the promise during the time allowed to the beneficiary to opt does not prevent the formation of the promised contract". The promisor's withdrawal is therefore no longer resolved in damages: it is ineffective. A beneficiary who exercises the option within the period relies on the formation of the promised contract.

The same provision protects against re-letting to a third party: "A contract concluded in breach of the unilateral promise with a third party who knew of its existence is void." The third party's knowledge is the condition for nullity, and it can be proved. Hence the interest, for a tenant who is the beneficiary of a promise over a sought-after unit, in making its existence known to the relevant market players and in keeping a record of exchanges with the competing operator.

These rules concern the unilateral promise. They cannot be transposed as they stand to the bilateral promise, whose regime rests on other foundations and must be assessed case by case.

Specific performance and its limit

Specific performance is governed by Article 1221, in the version resulting from Law No. 2018-287 of 20 April 2018, which is interpretative in nature:

"The creditor of an obligation may, after serving formal notice, seek its performance in kind unless such performance is impossible or there is a manifest disproportion between its cost for the debtor acting in good faith and its benefit for the creditor."

Two lessons for procedural strategy. First, formal notice is a prerequisite: starting proceedings without having served it weakens the claim. Second, the manifest disproportion exception benefits only the debtor acting in good faith. A promisor who withdraws in order to re-let at a higher rent to a competing retailer is not in a position to invoke it. The 2018 addition tightened this escape route, and it is the one that the defence of a landlord who refuses to complete principally targets.

Whether the judge records the formation of the lease or orders its regularisation subject to a penalty payment, and exactly how the disproportion exception fits with Article 1124, are matters for case law and call for case-by-case analysis before any proceedings are issued.

When compensation becomes the only outcome

If the commitment was only an offer, Article 1116 prevents the formation of the contract after withdrawal. If it involved only discussions, Article 1112 excludes compensation for loss of profit and for the loss of a chance of obtaining it. In both cases, the lever of specific performance disappears and the compensable loss is limited to the costs incurred. The difference in value between a letter of intent and a promise is measured exactly there.

In any event, sanctions that are not incompatible may be combined and, under Article 1217, "damages may always be added to them": a tenant who obtains regularisation of the lease may claim compensation for the delay in opening, and a landlord who obtains the lease taking effect may claim the rent lost over the period of immobilisation.

Formalities, substitution and tools for the pre-opening phase

The lease itself is subject to no formality as a condition of validity: Article 1714 of the Civil Code provides that "one may let either in writing or orally". Article 1589-2, which requires a notarial deed or a private agreement registered within ten days on pain of nullity, applies to the unilateral promise of sale relating in particular to "a right to a lease covering all or part of a building", that is, the assignment of a lease, as well as assignments of such promises. It does not apply to the promise to lease. Confusing the two leads either to imposing an unnecessary formality or to omitting a required formality in an assignment transaction.

The tenant substitution clause, usual in pre-letting (substitution in favour of an operating subsidiary, a franchisee or a project company), calls for tax vigilance. Article 725 of the General Tax Code subjects to registration duty determined under the rate in Article 719 "any assignment of a right to a lease or of the benefit of a promise to lease covering all or part of a building, whatever the form given to it by the parties". The provision also covers all deeds or agreements "that have the direct or indirect effect of transferring the right of enjoyment" of premises falling within the statute. The wording of the clause does not neutralise the classification.

Finally, the derogatory lease (bail dérogatoire) under Article L. 145-5 of the French Commercial Code is sometimes used in the pre-opening phase, to allow the tenant to occupy the premises before the statutory lease is signed. Since Law No. 2014-626 of 18 June 2014, the total term of the lease or successive leases must not be "more than three years". The provision is formidable for the landlord: if, at the end of that term, "and at the latest at the end of one month from the expiry date, the tenant remains and is left in possession, a new lease arises" governed by the statute. An inventory of condition on taking possession and on return is also mandatory. Combining a promise with a derogatory lease or a precarious occupation agreement before delivery carries a risk of requalification that must be weighed before signature. On the regime of the derogatory lease and its switch to a 3-6-9 lease, see our analysis devoted to this short-term commercial lease.

Conclusion: the promise is worth what its conditions precedent are worth

A promise to lease is not a preparatory document: it is the contract that determines who bears the construction risk, the regulatory risk and the market risk until delivery. Since 2016, the general law has given the beneficiary a real lever, since revocation by the promisor during the option period does not prevent the formation of the promised contract and specific performance is excluded only for a debtor acting in good faith. But that lever loses its substance if the commitment is suspended on conditions whose fulfilment depends on the will of the person who gives it, which Article 1304-2 strikes with nullity.

The drafting reflex is therefore as follows: review each condition precedent in the promise by asking who controls its fulfilment, and convert any condition depending on an internal decision into a dated duty of diligence, accompanied by supporting evidence and a long-stop date. Before signing a pre-letting promise, have a matrix drawn up of conditions precedent / holder / date of fulfilment / date of waiver / evidence expected, and check that the annexed draft lease already incorporates Article L. 145-32-1 and the annexes required by Articles L. 145-40-1 and L. 145-40-2. It is that document, and not the promise itself, that will show whether the commitment is enforceable.

Frequently asked questions

Must a commercial promise to lease be notarised or registered within ten days?

No. Article 1589-2 of the Civil Code, which requires a notarial deed or a private agreement registered within ten days on pain of nullity, applies to the unilateral promise of sale relating in particular to a right to a lease covering all or part of a building, that is, the assignment of a lease, as well as assignments of such promises. The lease itself is subject to no formality as a condition of validity: Article 1714 allows letting in writing or orally. By contrast, assignment of the benefit of a promise to lease is subject to registration duty at the rate in Article 719 of the General Tax Code, under Article 725. For long leases, land registration publicity obligations must be checked separately.

Can a landlord who refuses to sign the promised lease free itself by paying damages?

Not if it is a unilateral promise and the beneficiary exercises the option within the period. Since Order No. 2016-131 of 10 February 2016, Article 1124 of the Civil Code provides that revocation of the promise during the time allowed to the beneficiary to opt does not prevent the formation of the promised contract. The earlier rule, which resolved withdrawal in damages, is no longer that of the Code. The beneficiary may in addition seek specific performance on the basis of Article 1221, after formal notice, the manifest disproportion exception benefiting only the debtor acting in good faith.

Is a condition precedent requiring approval by the landlord's investment committee valid?

It is exposed to nullity. Article 1304-2 of the Civil Code makes void an obligation contracted under a condition whose fulfilment depends solely on the will of the debtor, that nullity not being capable of being invoked where the obligation has been performed with knowledge of the position. Approval by an internal body of the promisor depends by its nature on its will. The alternative wording is to refer to an external and objectively verifiable event: obtaining financing on stated terms, obtaining an identified administrative authorisation, reaching a level of committed lettable area measured at a set date.

What happens if the developer never files the authorisation application on which the promise depends?

Article 1304-3 of the Civil Code provides that the condition precedent is deemed fulfilled if the party who had an interest in it has prevented its fulfilment. The beneficiary can therefore rely on the condition as if it had been met, on the basis that it proves the deliberate failure to act. The evidence is prepared in the promise: obligation to file within a period expressed in days from signature, obligation to provide periodic information, production of supporting documents. Without these stipulations, the demonstration remains difficult.

Can a condition precedent still be waived after it has failed?

No. Article 1304-4, in the version resulting from Law No. 2018-287 of 20 April 2018, allows a party to waive a condition stipulated for its exclusive benefit "as long as it has not been fulfilled or has not failed". Once the date for fulfilment has passed without the condition being met, waiver is late and, under Article 1304-6, the obligation is deemed never to have existed. The promise must therefore set a waiver period expiring before the date of failure, and designate for each condition the party that is its exclusive beneficiary.

Can the annexed draft lease require rent payable quarterly in advance?

It can stipulate it, but the stipulation will not stand against a tenant's request falling under Article L. 145-32-1 of the French Commercial Code, in force since 28 May 2026. Monthly payment is a right where the tenant of premises intended for a retail or wholesale business, or for commercial or craft services, so requests, provided that there are no arrears in the payment of sums due in respect of rent and charges that have not previously been disputed, the request taking effect at the next due date. Article L. 145-15 deems not written any clause defeating that provision.

Can the three-year break right be removed from the promised lease?

Only in the cases referred to in Article L. 145-4 of the French Commercial Code: leases concluded for a term of more than nine years, leases of premises built for a single use, leases of premises used exclusively as offices, and leases of storage premises referred to in 3° of III of Article 231 ter of the General Tax Code. Outside those cases, the clause is deemed not written under Article L. 145-15. On a new asset, the classification of the premises must be justified by the technical description and the contractual use, and secured at the time of the promise rather than on the day of completion.

The simulator below calculates, from the start date of the lease, the key dates and the deadline for giving notice or requesting renewal.

Votre situation ressemble-t-elle à celle-ci ?

Quatre questions suffisent à situer votre position, le délai qui vous reste et ce qu'il faut vérifier en priorité. Vous décidez ensuite si vous en parlez au cabinet.

Décrire ma situation
Sans engagement – réponse du cabinet sous quarante-huit heures ouvrées.
• Vous êtes concerné ?

A commercial lease to defend or renegotiate?

Notice to quit, renewal, eviction indemnity: everything turns on dates and on the form of the documents.

bail
commercial-lease-promise-securing-pre-letting-of-an-asset-before-delivery
Questionnaire
×
Merci, votre demande est bien parvenue au cabinet. Une réponse vous sera adressée sous quarante-huit heures ouvrées.
L’envoi n’a pas abouti. Vous pouvez écrire directement à contact@avocats-gloria.com.

Vos réponses aux questions précédentes sont jointes à votre message. Réponse sous quarante-huit heures ouvrées.

Ces questions ne constituent pas une consultation juridique et ne remplacent pas l’examen de vos pièces. Les informations transmises servent uniquement à répondre à votre demande et ne sont pas cédées à des tiers.

← Question précédente

Gloria Avocats, your trusted legal partner

By email or by telephone, the firm will answer all your questions.

• Contact us