ERP works authorisation: the instrument that conditions the opening and operability of a commercial asset

Acquiring a commercial unit, a hotel, a gym or a building ground floor intended to receive the public is seldom decided on the price per square metre alone. It is decided on the date on which the asset can actually open and generate rent or turnover. Yet two separate administrative authorisations, the works authorisation provided for by Article L. 122-3 of the French Construction and Housing Code and the opening authorisation provided for by Article L. 122-5 of the same Code, condition that operability, each with its own competent authorities, its own time limits and its own grounds for blockage. An investor who treats the works authorisation for an establishment open to the public (ERP) as a post-acquisition formality takes on a timetable risk, an unbudgeted capex risk and, in severe cases, a risk of administrative closure. This guide sets out how the two instruments work, the processing times that determine the date of ERP opening, the regime of ERP accessibility derogations and the control points to build into a due diligence exercise.

Works authorisation and opening authorisation: two instruments, two risks

Article L. 122-3 of the French Construction and Housing Code, in the wording resulting from Law No. 2026-403 of 26 May 2026, lays down the principle:

Works leading to the creation, fitting out or modification of an establishment open to the public may be carried out only after authorisation issued by the administrative authority, which verifies their compliance with the accessibility rules laid down in Article L. 161-1 and, where the number of people admitted and the nature of the establishment justify it, their compliance with the fire safety rules laid down in Articles L. 141-2 and L. 143-2.

Three lessons follow for the operator. First, the triggering event is not construction but creation, fitting out or modification: a simple interior reconfiguration of an existing shop falls within the scope. Second, the control is twofold, accessibility and fire safety, each with its own processing route. Finally, verification of compliance with the accessibility rules is not required where the works have no effect on the accessibility of the built environment, and the same applies to fire safety where the works have no effect on the level of safety. The absence of any effect has to be demonstrated, it is not presumed: it must be documented in the file.

The works authorisation is issued in the name of the State. Article R. 122-7 designates the prefect (préfet) where the prefect is competent to issue the building permit or where the project concerns a high-rise building, and the mayor in other cases. In Paris, the handling of the file is compounded by the police powers specific to the Paris Police Prefect (préfet de police), which Article L. 143-3 expressly refers to for closure measures.

The works authorisation does not confer a right to open. Article L. 122-5 makes the opening of an establishment open to the public subject to a separate authorisation, issued after verification of compliance with the accessibility rules and, where the number of people admitted and the nature of the establishment justify it, with the fire safety rules. It is this instrument, and not the works authorisation, that conditions actual operation. An asset whose works authorisation is cleared but whose opening order (arrêté d'ouverture) has not been obtained remains an asset that cannot be operated.

The category of the establishment determines the level of control

The classification under Article R. 143-19 is not a matter of pure regulatory technique: it determines the volume of control, and therefore the timetable and the cost. The categories are set by reference to the number of members of the public and staff, increased by staff not occupying independent premises with their own exits:

  • 1st category: above 1,500 people
  • 2nd category: from 701 to 1,500 people
  • 3rd category: from 301 to 700 people
  • 4th category: 300 people and below, with the exception of establishments falling within the 5th category
  • 5th category: establishments falling under Article R. 143-14 in which the number of members of the public does not reach the minimum figure set by the safety regulations for each type of operation

A change of sign or concept can tip a unit from one category to another without any structural works, purely through the effect of the method of calculating occupancy. The point deserves to be checked before signing a commercial lease whose permitted use allows denser operation than that of the outgoing tenant. The conditions under which the tenant may change the activity carried on in the premises are dealt with separately in our article on the change of use of a commercial lease (déspécialisation).

The exemption for 5th category establishments without sleeping accommodation

Decree No. 2025-1100 of 19 November 2025, in force since 21 November 2025, introduced a substantial simplification. Section II of Article R. 122-7 now provides that the application for a works authorisation on fire safety grounds is not required for establishments classified in the 5th category that have no sleeping accommodation for the public, a brief description of the planned works being sent to the policing authority for information. Section II of Article R. 122-5 provides the same exemption for the application for an opening authorisation on fire safety grounds.

The exact scope of this exemption must be understood: it concerns only the fire safety aspect. Verification of compliance with the accessibility rules remains due under Article L. 122-3. A small local shop is therefore not outside the scope; it falls under a lighter regime on only one of the two aspects.

The declaratory regime for ERPs of less than 300 square metres

Law No. 2026-403 of 26 May 2026 added a procedural derogation to the first paragraph of Article L. 122-3. For establishments of less than 300 square metres equipped with a fire-extinguishing system suited to the fire risk or located in a railway station, and where they keep the same activity, the works authorisation is replaced by a declaration that the works comply with the accessibility and fire safety rules. This declaration is certified by a third party offering guarantees of competence and independence, and sent before the works begin to the administrative authority, which may object to it.

Two reservations apply before building an operation timetable on this mechanism. The text expressly makes its conditions of application subject to a decree adopted by the Conseil d'État. And the conditions are cumulative: floor area, extinguishing equipment or location in a station, and continuation of the same activity. A change of activity, frequent when repositioning a commercial asset, takes the operation out of the declaratory regime and returns it to the ordinary authorisation. Article L. 122-5 also provides that micro-enterprises and small and medium-sized enterprises may, on request, benefit from an advisory visit prior to the opening inspection, carried out by a specialist sub-commission, a mechanism whose terms also depend on a decree adopted by the Conseil d'État.

The processing timetable, from the application to the opening order

This is where most of the economic risk arises. The administrative timetable is not a single time limit but a superimposition of sequences, some of which run in parallel and others in succession.

On the accessibility side, the authority in charge of processing sends the application to the competent commission; under section I of Article R. 122-18, if the commission has not delivered its opinion within two months of the referral, it is deemed to have given a favourable opinion. On the safety side, Article R. 122-20 provides that the opinion of the safety commission (commission de sécurité) is deemed favourable if it is not given within two months of the referral.

As regards the decision itself, Article R. 122-21 states that, failing notification of an express decision within the four-month period referred to in Article R. 122-16, the works authorisation is deemed granted. Silence therefore amounts to acceptance, not refusal. This rule favours the applicant, but it calls for rigour: the starting point of the period and the regime for requests for additional documents must be checked file by file, since an incomplete file may move the starting point. Above all, a tacit authorisation is not a technical discharge. It does not dispense with the acceptance inspection or with the opening authorisation, and it does not protect against requirements formulated later by the commission.

The extended route for an application for a derogation

Where the application for a works authorisation includes an application for a derogation based on Article R. 164-3 and the authority competent to decide is the mayor, the mayor sends without delay, on receipt of the complete file, a copy of the application and of the file to the prefect. The competent accessibility commission is then the departmental commission, and section II of Article R. 122-18 specifies that this competence cannot be delegated. The prefect notifies the applicant of the reasoned decision and informs the processing authority within two weeks following the decision.

The period for tacit acceptance here is different and longer: failing a reply from the prefect within three months and two weeks from the date on which the authorisation application was received or completed, the derogation sought is deemed granted, but only where it concerns establishments of the third, fourth and fifth categories. For a 1st or 2nd category establishment, this text provides for no tacit agreement: an express decision is necessary. A hotel, a shopping centre or a large-capacity performance venue therefore cannot build its opening schedule on the assumption of a derogation obtained through silence.

The acceptance inspection and the opening order

Article R. 143-38 provides that the safety commission may carry out on-site visits during construction or fitting-out works, and that before any opening of establishments to the public, as well as before the reopening of establishments closed for more than ten months, an acceptance inspection is carried out by the commission, which proposes such minor modifications as it considers necessary. The ten-month threshold is of direct concern to the investor in vacant or distressed assets: taking over a unit closed for more than ten months reopens the control, even without works.

Article R. 143-39 sets out the form of the final instrument: the mayor authorises opening by an order made after the commission has given its opinion, the order being notified directly to the operator by administrative channels or by registered letter with acknowledgment of receipt, a certified copy being sent to the State representative in the département. Section I of Article R. 122-5 completes the mechanism: the opening authorisation is issued on the basis of the certificate drawn up under Article R. 122-30 where the works were the subject of a building permit, or after the opinion of the competent commission where the establishment has not undergone works or only works not subject to a building permit, the commission then ruling after a site visit for establishments of the first to the fourth category.

Two practical consequences follow. For any 1st to 4th category asset, a physical visit has to be built into the reverse schedule, with its share of uncertainty over when the commission will attend. And the certificate under Article R. 122-30, drawn up by a person meeting the criteria of Article L. 122-12 after a site visit, becomes a blocking document: its minimum content includes in particular the contact details of the project owner, the references of the operation and of the building permit, the contact details of the person drawing up the certificate, the conclusion on compliance with the accessibility regulations and the main technical information supporting it. This is not to be confused with the document under Article L. 122-9, whose wording in force since 1 January 2024 concerns compliance with the construction rules on energy and environmental performance.

Building permit and ERP: the interior fit-out trap

Article R*425-15 of the French Town Planning Code and Article R. 122-9 of the French Construction and Housing Code provide for absorption: where the project concerns an establishment open to the public, the building permit takes the place of the authorisation provided for in Article L. 122-3 provided that the decision has received the agreement of the competent authority defined in Article R. 122-7, the agreement on compliance with the accessibility rules being processed and issued under the ERP procedure.

The exception is the most frequent source of disputes in operations where the tenant is not identified at the time of filing. Where the interior fit-out of the establishment or of part of it is not known when the application is filed, the building permit says so and a supplementary authorisation under Article L. 122-3 alone must be applied for and obtained, in respect of that interior fit-out, before opening to the public. A developer or an investor who delivers a shell-and-core unit to a commercial tenant thus passes on a residual administrative act, the obtaining of which conditions the date on which the lease takes economic effect. The allocation of this burden and this risk between landlord and tenant is a matter for contractual negotiation and must be dealt with explicitly, failing which the debate will open at the stage of the rent-free period or of delivery.

A last point on scope: Article L. 122-3 does not apply where the works cause the whole of the building to lose its status as an establishment open to the public, except where it is located in a priority urban policy district within the meaning of Article 5 of Law No. 2014-173 of 21 February 2014. An operation to convert shops or offices open to the public entirely into housing therefore falls outside the regime, subject to this territorial reservation, which deserves a map check before the operation is structured. On the town planning aspect of such a conversion, see our analysis of the change of use of an asset.

Accessibility derogations: a fragile benefit passed on with the asset

Article R. 164-3 allows the prefect to grant derogations from the accessibility rules in four cases: technical impossibility resulting from the environment of the building; constraints linked to the preservation of architectural heritage for buildings that are listed, registered, protected as part of their surroundings, located within a remarkable heritage site or identified under Article L. 151-19 of the French Town Planning Code; manifest disproportion between the improvements made and their costs, their effects on the use of the building and its surroundings or the viability of the operation of the establishment; and lastly opposition by the general meeting of co-owners of a building mainly used for housing and existing on 28 September 2014, the derogation then being granted as of right where the refusal is raised against an establishment open to the public existing in that building.

The economic ground is expressly recognised: the text covers the case where the cost or nature of the accessibility works is such that they prove impossible to finance or have a critical negative impact on the economic viability of the establishment, the existence of that impossibility or those difficulties being established in particular by the exceeding of thresholds set by order. It also covers the case of a break in the chain of movement within the footprint of the establishment making pointless, downstream, the implementation of a technical requirement for a given type of disability.

The decisive point for the purchaser appears in the last paragraph of section I. If the building for which a derogation has been granted is the subject of a building permit application or a works authorisation application altering the layout or equipment covered by that derogation, its continuation is conditional on an application being made to that effect. Absent an application for continuation or a new application, the derogation previously granted is deemed lapsed on the date the site opens or the works begin. In other words, a derogation obtained by the previous operator does not follow the asset unconditionally: repositioning works may cause it to fall and bring back an accessibility cost that the business plan has not provisioned. Where the establishment performs a public service mission, section II adds that the derogation may be granted only if a substitute measure is provided for.

The cost of non-compliant operation

Article L. 143-3 structures the administrative sanction. The mayor or the State representative in the département may, by an order made after the opinion of the competent safety commission, order the closure of establishments open to the public that breach the safety rules specific to that type of establishment, until the compliance works have been carried out. The closure order is made after a formal notice (mise en demeure) to the operator or the owner, which has gone unheeded, to comply with the prescribed fittings and works or to close the establishment within the period set.

The order may attach to the closure a daily penalty for delay (astreinte). Its amount may not exceed €500 per day of delay, it is adjusted to take account of the nature of the offence and its consequences for public safety, recovery is initiated per quarter elapsed and the total amount recovered may not exceed the amount of the fine provided for in section V. At the quarterly settlement, the administrative authority may grant a partial or total exemption if the debtor establishes that the non-performance is due to circumstances beyond its control. Closure may be enforced of the authority's own motion after an unsuccessful formal notice, at the expense of the owner or the operator. Failure by the owner or the operator to close despite formal notice is punishable by a fine of €10,000. In Paris, these powers are exercised by the Paris Police Prefect.

The real exposure is not so much the capped penalty as the loss of operating income during the closure, the effect on the rental value of the asset and, for a landlord, the dispute with the tenant over who is responsible for the closure.

Pre-acquisition due diligence: the documents to require and the clauses to negotiate

The audit of a commercial asset intended to receive the public must cover the complete chain of instruments, and not merely the title deed. The documents to request from the seller or outgoing landlord:

  • the most recent works authorisation under Article L. 122-3, or the building permit taking its place with the agreement of the competent authority
  • any supplementary authorisation relating to the interior fit-out, where the permit mentions that it is needed
  • the opening authorisation order made under Articles L. 122-5 and R. 143-39, with its notification
  • the minutes of the safety commission, including those of the acceptance inspection and periodic visits, and the list of requirements formulated and of their lifting
  • the accessibility derogation orders issued on the basis of Article R. 164-3, and the analysis of whether they continue in light of the planned works
  • the post-works accessibility certificate drawn up under Article R. 122-30
  • the public accessibility register, which the operator of any establishment open to the public must draw up under Article R. 164-6, and which contains complete information on the services provided, the list of administrative and technical documents relating to accessibility and the description of the training given to staff responsible for receiving people with disabilities

The absence or thinness of the register is a warning sign: Article L. 164-1 requires that establishments located in an existing built environment be made accessible in the parts open to the public and that a register be kept there. An empty register generally reflects defective regulatory monitoring across the whole perimeter. The accessibility obligations weighing on an existing establishment, and the allocation of their burden between owner and operator, are detailed in our article on the ERP accessibility certificate.

On the contractual side, the translation takes place in three stages. In the preliminary agreement, a condition precedent of obtaining the authorisations necessary for the planned operation, drafted by reference to both instruments, the works authorisation and the opening authorisation, and not merely the planning authorisation. During the works phase, a clause allocating the cost of the requirements formulated by the commission, with an exit threshold beyond which the purchaser or the tenant may withdraw. In the lease, an explicit link between the contractual permitted use, the ERP category it implies and the burden of subsequent compliance works. These mechanisms depend on freedom of contract and on how the courts assess them: it is their drafting, and not their mere presence, that determines the actual allocation of risk.

Trade-off: ERP authorisation is a condition of value, not a formality

The subject is not regulatory, it is financial. Between the referral to the commissions, the four-month period of Article R. 122-21, the prefectoral route of three months and two weeks in the case of a derogation, the acceptance inspection and the opening order, the administrative chain determines the date of first rent. It may also, through the lapse of derogations provided for in Article R. 164-3, reactivate an accessibility cost that the seller had neutralised. The recent simplifications, exemption from the fire safety aspect for the 5th category without sleeping accommodation since Decree No. 2025-1100 of 19 November 2025 and the declaratory regime for establishments of less than 300 square metres resulting from Law No. 2026-403 of 26 May 2026, reduce the procedural burden on a specific segment of assets, but do not change the overall logic: opening remains subject to a control.

Our recommendation is direct. Before signing a unilateral promise or a lease relating to a unit intended to receive the public, have a qualified professional prepare an ERP feasibility note, covering the category concerned, the works requiring authorisation, existing derogations and their fate, and make its conclusions an express condition precedent. Do not settle for a works authorisation on file: require the opening order and the latest minutes of the safety commission. It is this document, and not the works authorisation, that attests that the asset can be operated.

Frequently asked questions

Is the ERP works authorisation enough to open the establishment to the public?

No. Article L. 122-3 of the French Construction and Housing Code governs the carrying out of works to create, fit out or modify an establishment open to the public, whereas Article L. 122-5 makes opening subject to a separate authorisation, issued after verification of compliance with the accessibility rules and, where the number of people admitted and the nature of the establishment justify it, with the fire safety rules. Article R. 143-39 specifies that the mayor authorises opening by an order made after the commission has given its opinion, notified directly to the operator. Opening on the sole basis of a works authorisation exposes the operator to the policing powers of Article L. 143-3.

What happens if the administration does not respond to the works authorisation application?

Article R. 122-21 provides that, failing notification of an express decision within the four-month period referred to in Article R. 122-16, the works authorisation is deemed granted. Silence therefore amounts to acceptance. Upstream, the commission's opinion on accessibility is deemed favourable if it is not delivered within two months of the referral, and the opinion on safety is deemed favourable if it is not given within two months. These tacit approvals do not dispense with the acceptance inspection or with the opening authorisation.

Does an accessibility derogation obtained by the previous operator remain valid after works?

Not automatically. Article R. 164-3 provides that if the building that benefited from a derogation is the subject of a building permit application or a works authorisation application altering the layout or equipment covered by that derogation, its continuation is conditional on an application being made to that effect. Absent an application for continuation or a new application, the derogation previously granted is deemed lapsed on the date the site opens or the works begin. This point must be among the preliminary checks for any repositioning operation.

Are small shops exempt from an ERP works authorisation?

Partially. Since Decree No. 2025-1100 of 19 November 2025, section II of Article R. 122-7 provides that the application for a works authorisation on fire safety grounds is not required for establishments classified in the 5th category with no sleeping accommodation for the public, a brief description of the works being sent to the policing authority for information. Section II of Article R. 122-5 provides the same exemption for the application for an opening authorisation on fire safety grounds. The accessibility aspect remains due under Article L. 122-3.

What does the new declaratory regime for ERPs of less than 300 square metres involve?

Article L. 122-3, in the wording resulting from Law No. 2026-403 of 26 May 2026, replaces the works authorisation with a declaration of compliance with the accessibility and fire safety rules for establishments of less than 300 square metres equipped with a fire-extinguishing system suited to the fire risk or located in a railway station, where they keep the same activity. This declaration must be certified by a third party offering guarantees of competence and independence and sent before the works begin to the administrative authority, which may object to it. The conditions of application are specified by a decree adopted by the Conseil d'État: check that this decree has been published before building an operation timetable on this regime.

Is a new visit from the safety commission needed to reopen a vacant unit?

Yes, beyond a certain length of closure. Article R. 143-38 provides that before any opening of establishments to the public, as well as before the reopening of establishments closed for more than ten months, an acceptance inspection is carried out by the commission, which proposes such minor modifications as it considers necessary. For establishments of the 1st to 4th category within the meaning of Article R. 143-19, point b of section I of Article R. 122-5 specifies that the commission rules after a site visit. This ten-month period is a central point of attention in acquisitions of vacant assets.

What penalties apply for operating a non-compliant ERP?

Article L. 143-3 allows the mayor or the prefect to order, by an order made after the opinion of the safety commission and after a formal notice that has gone unheeded, the closure of the establishment until the compliance works have been carried out. The order may provide for a daily penalty for delay of no more than €500 per day of delay, recovered per quarter elapsed and capped at the amount of the fine. Closure may be enforced of the authority's own motion at the expense of the owner or the operator, and failure to close despite formal notice is punishable by a fine of €10,000. In Paris, these powers are exercised by the Paris Police Prefect.

The simulator below tells you which planning permission is required, the processing times, the appeal deadlines and how long the permit remains valid.

Votre situation ressemble-t-elle à celle-ci ?

Quatre questions suffisent à situer votre position, le délai qui vous reste et ce qu'il faut vérifier en priorité. Vous décidez ensuite si vous en parlez au cabinet.

Décrire ma situation
Sans engagement – réponse du cabinet sous quarante-huit heures ouvrées.
• Vous êtes concerné ?

A question about your own situation?

The firm assists business owners, investors and private individuals, from upstream advice through to litigation.

generique
erp-works-authorisation-conditioning-opening-of-a-commercial-asset
Questionnaire
×
Merci, votre demande est bien parvenue au cabinet. Une réponse vous sera adressée sous quarante-huit heures ouvrées.
L’envoi n’a pas abouti. Vous pouvez écrire directement à contact@avocats-gloria.com.

Vos réponses aux questions précédentes sont jointes à votre message. Réponse sous quarante-huit heures ouvrées.

Ces questions ne constituent pas une consultation juridique et ne remplacent pas l’examen de vos pièces. Les informations transmises servent uniquement à répondre à votre demande et ne sont pas cédées à des tiers.