Articles

Letting ban and DPE rating: the timetable that drives capex and the landlord's decision

As at 16 November 2026, a landlord holding a residential portfolio in mainland France has a little over thirteen months before the 1 January 2028 threshold, the date on which a dwelling rated F will cease to be decent. The question is no longer whether the timetable applies, but which assets it renders unusable, over what timeframe, and what volume of energy capex must be committed to preserve letting capacity and, as a consequence, valuation and financing covenants. Yet the positive law is more nuanced than the media shorthand of a “ban on letting”: the statute does not create an administrative policing of leases, it reclassifies the dwelling as non-decent, with civil-law effects, and at the same time it introduced limits on the powers of the court whose consequences few market participants have drawn. This analysis sets out the timetable as it appears in the legislation, distinguishes the neighbouring obligations that practice tends to confuse, and derives from it a framework for the decision to retain, sell or restructure.

The timetable for energy decency: what Article 6 of the Law of 6 July 1989 says exactly

Three thresholds, three classes

Since 1 January 2025, Article 6 of Law No. 89-462 of 6 July 1989 requires the landlord to provide a dwelling meeting a minimum performance level within the meaning of Article L. 173-1-1 of the French Construction and Housing Code (code de la construction et de l'habitation). The same article sets the timetable:

1° From 1 January 2025, between class A and class F; 2° From 1 January 2028, between class A and class E; 3° From 1 January 2034, between class A and class D.

Three points of precision govern the whole economic reading. First, the 2034 threshold refers to class D, not class E: the error is frequent in investment notes and leads to undersizing the works programme for an asset currently rated E and compliant. Second, the text reasons in terms of rating bands, not a consumption threshold. Third, Article 6 itself draws the consequence of non-compliance: dwellings that do not meet the above criteria by the stated deadlines are considered non-decent.

Overseas territories: a timetable shifted by three years

For Guadeloupe, Martinique, French Guiana, La Réunion and Mayotte, Article 6 sets its own timetable: a level between class A and class F from 1 January 2028, then between class A and class E from 1 January 2031. A portfolio mixing mainland France and overseas territories therefore cannot be managed on a single timeline.

The shift from kWh to rating class, since 1 January 2025

Before 1 January 2025, energy decency was read as a performance criterion defined by a maximum threshold of final energy consumption per square metre per year. Article 160 of Law No. 2021-1104 of 22 August 2021 replaced that criterion with a reference to the rating under Article L. 173-1-1 of the French Construction and Housing Code, which came into force on 1 January 2025. The threshold of 450 kilowatt-hours of final energy per square metre per year is no longer the rule of energy decency in mainland France; it survives in specific provisions, such as the adaptation of Decree No. 2002-120 of 30 January 2002 to Saint-Pierre-et-Miquelon. Lease clauses or portfolio notes drafted on the former criterion are therefore obsolete in their reasoning.

“Letting ban for energy rating (DPE)”: a journalistic shorthand, not a legal characterisation

The applicable regime is that of non-decency

Article 6 provides for neither an administrative ban on letting nor a fine. It characterises: a dwelling outside the bands is considered non-decent. The effect therefore lies in contract and landlord-tenant litigation, at the initiative of the tenant, who may bring an action for the dwelling to be brought into compliance. For an institutional landlord, the difference is structural. The risk is not a police measure striking the building; it is a diffuse risk, triggered unit by unit, whose intensity depends on the behaviour of occupants, local pressure from tenant associations and the remaining term of the leases. It is, in that respect, less visible but harder to provision for than an administrative penalty.

The phrase “ban on letting” retains a descriptive usefulness: from each threshold onwards, a non-compliant asset can no longer be offered for letting as a main residence without exposing the landlord to this reclassification. But writing “ban” in a risk note amounts to describing the wrong regime, and therefore miscalibrating the procedural response.

The two limits on the court's powers introduced on 1 January 2025

Article 160 of Law No. 2021-1104 also amended Article 20-1 of the Law of 6 July 1989, with effect from 1 January 2025. The court may not order works to bring the dwelling up to the minimum performance level in two situations: where the dwelling is located in a co-owned building (copropriété) and the co-owner shows that the steps taken, both on the common parts and on their private parts, have remained unsuccessful; and in the case of architectural or heritage constraints, the criteria being specified by decree of the Conseil d'État.

These two exceptions do not amount to immunity. The text specifies that they apply without prejudice to the court's ability to order other measures, foremost among them a rent reduction. The operational lesson is clear for a landlord in a co-owned building: proof of the steps taken is built upstream and in writing, requests for items to be placed on the agenda, votes obtained or refused, quotes requested, formal notices to the property manager (syndic). A documented file of steps taken is a procedural asset; an absence of traceability leads straight to an order to carry out the works, or to a rent abatement over the term of the lease.

Two obligations with neighbouring dates: decency (Law of 1989) and Article L. 173-2 of the CCH

The costliest confusion in due diligence consists in treating as a single block the 2028 decency deadline and the obligation under Article L. 173-2 of the French Construction and Housing Code, which carries the same date.

Two scopes, two exemption regimes

Article L. 173-2 provides that from 1 January 2028, the performance level of buildings or parts of buildings for residential use is between classes A and E. This obligation concerns the building, irrespective of whether there is a lease. It contains two exemptions of its own: buildings which, because of their technical, architectural or heritage constraints, cannot be the subject of works making it possible to reach that level; and those for which the cost of the works is manifestly disproportionate to the value of the property, the criteria being specified by decree of the Conseil d'État.

These exemptions do not carry over to decency. Article 6 of the Law of 1989 knows no exemption based on disproportionate cost. On the lease side, the only flexibility introduced lies at the level of the court's powers, in the terms recalled above. An investor who buys at a discount counting on the disproportionate-cost exemption therefore buys, at best, partial protection: it operates in respect of the building performance obligation, not in respect of the decency of the let dwelling.

Postponement to 1 January 2033 for certain distressed co-ownerships

Section II of Article L. 173-2 postpones the obligation to 1 January 2033 for co-ownerships that are subject to a safeguard plan, that fall within the perimeter of a programmed housing improvement operation included in its component on the recovery of distressed co-ownerships, that fall within the perimeter of an operation to requalify degraded co-ownerships, for which the court has appointed a provisional administrator on the basis of Articles 29-1 or 29-11 of the Law of 10 July 1965, or that have been declared in a state of default (carence). Here again, the postponement concerns the obligation under Article L. 173-2, not the decency timetable.

Mandatory disclosures: an obligation already in force, which changes in nature in 2028

Section III of Article L. 173-2 requires, since 1 January 2022, that the performance obligation be mentioned in advertisements relating to sale or letting as well as in sale deeds and leases concerning a non-compliant property. Overseas, this first obligation has applied only since 1 July 2024. From 1 January 2028, the mention changes its object: it is the failure to comply with the obligation that will have to appear in advertisements, sale deeds and leases. For an institutional landlord managing listings in volume, this is a documentary compliance workstream to be handled before the end of 2027: lease templates, listing templates, configuration of marketing tools.

The rent freeze: the income shock comes before the decency deadline

Article 17-2 II of the Law of 6 July 1989, derived from Article 159 of Law No. 2021-1104, states that the rent may not be revised upwards on renewal of the contract for dwellings in class F or class G. The measure applies to contracts entered into, renewed or tacitly renewed since 24 August 2022, and, overseas, to those entered into, renewed or tacitly renewed after 1 July 2024.

The consequence for modelling is direct. A let energy-inefficient dwelling (passoire thermique) produces a cash flow that is nominally frozen on renewal, while the building's costs and the cost of debt move. The erosion of real income therefore precedes the non-decency deadline by several years. In a capitalisation-based valuation, this loss of rental momentum is added to the discount for unusability and to the amount of energy capex to be committed: three effects that accumulate on the same asset and that it is wrong to treat separately.

The energy performance certificate (DPE) as asset data: proof, duration and level of granularity

The rating is proved by the energy performance certificate (diagnostic de performance énergétique, DPE) defined in Article L. 126-26 of the French Construction and Housing Code, drawn up by a person meeting the conditions of Article L. 271-6 of the same Code. The text leaves it to regulations to set its period of validity: the applicable period and the fate of certificates produced before the successive reforms of the method are matters for orders (arrêtés), which should be checked certificate by certificate before locking in a portfolio strategy on an old rating.

At building level, Article L. 126-31 of the French Construction and Housing Code, in the wording resulting from Law No. 2026-403 of 26 May 2026, in force since 28 May 2026, requires every multi-unit residential building whose building permit application was filed before 1 January 2013 to have an energy performance certificate produced under the conditions of Article L. 126-26, renewed or updated every ten years, except where a certificate produced after 1 July 2021 establishes that the building belongs to class A, B or C. This consolidated version no longer contains the paragraphs relating to the feasibility study of renewable energy supply by social housing bodies, which have been repealed. Internal notes that still cite those paragraphs need to be revisited.

The building-level DPE does not entail compliance of individual units: decency is assessed dwelling by dwelling. But it constitutes, in practice, the technical basis for the discussion at the general meeting and the starting point for costing energy capex on the common parts. The interplay between the collective certificate, the energy audit and voted capex is detailed in our article on the collective DPE and the usability of an investment building.

Deciding: retain, sell or restructure

Retain and renovate: sequence by threshold, not by convenience

The rational sequencing consists in dealing first with the assets that lose their usability on 1 January 2028, that is to say those rated F, then in studying without delay the move from D to C for assets whose holding horizon extends beyond 2034. A programme that takes a unit from F to E consumes capital for compliance whose term is set at 1 January 2034, since the required level will then be between classes A and D. For a long holding, the one-step jump to D or better is generally the only defensible logic before an investment committee, even if the immediate cost is higher.

In a co-owned building, feasibility does not depend on the landlord alone. Works on the common parts fall under the mechanisms of the Law of 10 July 1965 and the general meeting calendar. Hence the twofold discipline: begin the steps early, and document them with a view to the exception provided for in Article 20-1 of the Law of 1989 as amended by Article 160 of the Climate Act (loi Climat), which precisely requires showing unsuccessful steps on both common and private parts.

Selling: the energy audit under Article L. 126-28-1 sets the narrative of the sale

Article L. 126-28-1 of the French Construction and Housing Code requires an energy audit where there are offered for sale buildings or parts of buildings for residential use comprising a single dwelling, or several dwellings not subject to the co-ownership regime, and belonging to classes D, E, F or G. The timetable for entry into force appears in Section VII of Article 158 of Law No. 2021-1104: 1 January 2022 for classes F and G, 1 January 2025 for class E, 1 January 2034 for class D. Overseas, the dates are 1 July 2024 for classes F and G and 1 January 2028 for class E.

The content of the audit is not neutral for the negotiation. It sets out proposals for works that are compatible with the easements under the Heritage Code and whose cost is not disproportionate to the value of the property, and presents a coherent works pathway in stages the first of which makes it possible at a minimum to reach class E, the pathway also providing for the works needed to reach class B where technical, architectural or heritage constraints or cost do not stand in the way of that level. The audit states, for information, the theoretical impact of the works on the energy bill and provides orders of magnitude for costs. In other words, the seller of a single-ownership property hands the buyer a costing that will serve as the anchor for the discount. Selling without having prepared one's own technical counter-analysis amounts to letting the buyer alone set the price of the risk. On the use the buyer can make of this document, see our analysis of the mandatory energy audit in price negotiation.

Switching to tourist furnished lettings: a door partly closed since 2024

The option of leaving the residential lease to move to tourist letting does not escape the rating. Article L. 631-10 of the French Construction and Housing Code, in the wording resulting from Law No. 2024-1039 of 19 November 2024, makes the grant of the prior authorisation provided for in Articles L. 631-7 or L. 631-7-1 A, with a view to letting furnished tourist accommodation, conditional on presentation of an energy performance certificate with a level between classes A and E, or, from 1 January 2034, between classes A and D. The article applies only in mainland France, and its scope is that of change of use subject to authorisation: it cannot be extended beyond that. An energy-inefficient dwelling located in a municipality that has introduced prior authorisation therefore cannot be recycled into tourist accommodation to circumvent the timetable. Registration, change of use and co-ownership constraints are covered separately in our article on securing tourist furnished lettings.

Restructure: changing the granularity of the asset

The last route is restructuring of the building, which shifts the problem from the unit to the structure: merging or redividing units, reworking the envelope, change of use. It requires a planning and technical feasibility file, and a timetable compatible with the 2028 or the 2034 threshold. It makes sense only if it is handled as an operation, with its own financing plan, and not as a palliative for a delayed renovation programme.

Timetable risk: a political review fixed before 1 July 2027

Section III of Article 160 of Law No. 2021-1104 provides that, before 1 July 2027, the Government is to submit to Parliament a report assessing the application of that article and appraising the foreseeable impact of the raising of the performance level of a decent dwelling provided for from 1 January 2034, in particular with regard to the availability of renovation capacity and its potential effects on the private rental market.

This milestone should be factored in as a timetable uncertainty, not as a promise of relaxation. The 2034 deadline is in the statute today and applies to decisions taken in 2026 and 2027. Building an energy capex plan on a bet of postponement amounts to making the usability of a portfolio depend on an unwritten parliamentary decision. By contrast, including in acquisition contracts and shareholder agreements a review clause indexed to the evolution of the regime is sound contractual management.

Conclusion: the decency timetable has become a usability clause

The position we put forward is simple. The timetable under Article 6 of the Law of 6 July 1989 should no longer be treated as a peripheral regulatory constraint, but as an intrinsic characteristic of the asset, on a par with the letting position or the condition of the common parts. It determines the ability to relet, it freezes the rent of classes F and G on renewal, it requires the seller of a single-ownership property to hand the buyer a works costing, and it closes the option of change of use to tourist furnished accommodation in mainland France. The decision to retain, sell or restructure is therefore played out less on instantaneous yield than on the date on which the asset ceases to be lettable and on the cost of bringing it up to standard on that date.

Before any commitment of energy capex or any signature of a promise to sell, have a class-by-class statement of your portfolio drawn up, distinguishing the F units to be dealt with before 1 January 2028 and the D units whose horizon is 1 January 2034, then have the wording of your leases and listings validated against Section III of Article L. 173-2 of the French Construction and Housing Code. In a co-owned building, begin the steps on the common parts as of the next general meeting and keep a record of them: this is today the only serious line of defence against an order to carry out works.

Frequently asked questions

From what date does a dwelling rated F become non-decent? From 1 January 2028 in mainland France. Article 6 of Law No. 89-462 of 6 July 1989, in the wording in force since 1 January 2025, provides that the performance level of a decent dwelling is between class A and class E from that date. In Guadeloupe, Martinique, French Guiana, La Réunion and Mayotte, 1 January 2028 corresponds to the A to F threshold, the A to E threshold applying only on 1 January 2031. Dwellings that do not meet the criteria by the stated deadlines are considered non-decent.

Does the 2034 deadline refer to class E or class D? Class D. Article 6 of the Law of 1989 states that from 1 January 2034, the performance level of a decent dwelling is between class A and class D. A dwelling rated E, compliant on 1 January 2028, will therefore cease to be so on 1 January 2034. This is why a works programme taking a unit from F to E buys only temporary compliance for a long holding.

Is there an administrative fine for letting an energy-inefficient dwelling? Article 6 of the Law of 6 July 1989 provides for neither an administrative ban on letting nor a fine: it characterises the dwelling as non-decent. Litigation therefore falls under the non-decency regime, at the initiative of the tenant, who may in particular request that the dwelling be brought into compliance. The expression “letting ban for energy rating (DPE)” is a convenient shorthand but legally inaccurate. The consequences for personal housing allowances fall under separate texts, to be checked case by case.

Can a co-owner be ordered to carry out works they do not control? Since 1 January 2025, Article 160 of Law No. 2021-1104 of 22 August 2021 has amended Article 20-1 of the Law of 6 July 1989 to prohibit the court from ordering works to bring the dwelling up to the minimum performance level where the dwelling is in a co-owned building and the co-owner shows that their steps, on common parts as well as private parts, have remained unsuccessful. The same limit applies in the case of architectural or heritage constraints, according to criteria specified by decree of the Conseil d'État. These exceptions apply without prejudice to the other measures the court may order, notably a rent reduction.

Can the rent of a dwelling rated F or G still be increased on renewal of the lease? No. Section II of Article 17-2 of the Law of 6 July 1989, derived from Article 159 of Law No. 2021-1104, provides that the rent may not be revised upwards on renewal of the contract for dwellings in classes F and G. The measure covers contracts entered into, renewed or tacitly renewed since 24 August 2022, and, overseas, after 1 July 2024. The freeze of rent on renewal therefore precedes the loss of usability of the asset by several years.

Is an energy audit mandatory to sell a co-owned apartment rated E? No. Article L. 126-28-1 of the French Construction and Housing Code covers only buildings or parts of buildings for residential use comprising a single dwelling, or several dwellings not subject to the co-ownership status of the Law of 10 July 1965, belonging to classes D, E, F or G. The obligation entered into force on 1 January 2022 for classes F and G, on 1 January 2025 for class E and on 1 January 2034 for class D, under Section VII of Article 158 of Law No. 2021-1104.

Does turning an energy-inefficient dwelling into tourist furnished accommodation make it possible to escape the timetable? Not where the operation requires a change-of-use authorisation. Article L. 631-10 of the French Construction and Housing Code, derived from Law No. 2024-1039 of 19 November 2024, makes the prior authorisation under Articles L. 631-7 or L. 631-7-1 A, with a view to letting furnished tourist accommodation, conditional on an energy performance certificate between classes A and E, and between classes A and D from 1 January 2034. This article applies only in mainland France.

The simulator below sets out, according to the energy rating, the letting bans, the rent freeze and the obligations on a sale.

Votre situation ressemble-t-elle à celle-ci ?

Quatre questions suffisent à situer votre position, le délai qui vous reste et ce qu'il faut vérifier en priorité. Vous décidez ensuite si vous en parlez au cabinet.

Décrire ma situation
Sans engagement – réponse du cabinet sous quarante-huit heures ouvrées.
• Vous êtes concerné ?

A question about your own situation?

The firm assists business owners, investors and private individuals, from upstream advice through to litigation.

generique
letting-ban-and-dpe-rating-timetable-driving-capex-and-landlord-decision
Questionnaire
×
Merci, votre demande est bien parvenue au cabinet. Une réponse vous sera adressée sous quarante-huit heures ouvrées.
L’envoi n’a pas abouti. Vous pouvez écrire directement à contact@avocats-gloria.com.

Vos réponses aux questions précédentes sont jointes à votre message. Réponse sous quarante-huit heures ouvrées.

Ces questions ne constituent pas une consultation juridique et ne remplacent pas l’examen de vos pièces. Les informations transmises servent uniquement à répondre à votre demande et ne sont pas cédées à des tiers.

← Question précédente

Gloria Avocats, your trusted legal partner

By email or by telephone, the firm will answer all your questions.

• Contact us