A building permit displayed on a neighbouring plot, a project that erodes the residual development potential of a piece of land or the rental value of an office building, and a decision to be taken within a few weeks: whether or not to challenge it. The most common reflex is to send a letter of objection to the mayor, in the belief that this saves time. That is true as far as the calendar is concerned, provided three unforgiving mechanisms are mastered: the real starting point of the time limit, the mandatory notification of the administrative appeal, and the precise moment at which the time limit for court proceedings starts to run again. This guide treats the informal appeal to the authority that issued the decision (recours gracieux) against a building permit for what it is first and foremost, an act that operates on the procedural calendar, identifying what it extends, what it does not neutralise, and when it locks in or compromises the subsequent court challenge.
The informal appeal is first and foremost an operation on the time limit
The legal basis of the informal appeal is not found in the Town Planning Code but in the Code of Relations between the Public and the Administration (CRPA). Its Article L. 411-2 provides:
Any administrative decision may be the subject, within the time limit allowed for bringing court proceedings, of an informal appeal or a hierarchical appeal, which interrupts the running of that time limit.
Two conditions can be read in this sentence. First, the appeal must be made within the time limit allowed for bringing court proceedings: an informal appeal sent after the time limit has expired does not have the effect that the text attaches to an informal appeal made within the time limit. Second, the effect produced is an interruption of the running of the time limit, which means that a full new time limit will start, and not the remainder of the initial one.
The informal appeal is addressed to the author of the decision, in practice the mayor or the president of the competent public body. The hierarchical appeal (recours hiérarchique) is addressed to the higher authority. Article L. 411-2 expressly governs their combination:
Where, within the initial time limit for court proceedings open against the decision, both an informal appeal and a hierarchical appeal are made against that decision, the time limit for court proceedings, extended by the making of those administrative appeals, starts to run again in respect of the initial decision only once both have been rejected.
On the other hand, the text says nothing about the effect of a second informal appeal made after the first, or about the scope of an informal appeal filed out of time. These questions are a matter for administrative case law and must be checked file by file. Building a strategy of extending the time limit on the assumption that a second informal appeal would have the same effect as the first would be a risk out of proportion to what is at stake: the time-bar (forclusion) is irreversible.
An informal appeal and a request for withdrawal are not the same thing
The third party who writes to the mayor is, in practice, asking for the permit to be withdrawn. However, the administration's power of withdrawal is strictly limited. Article L. 424-5 of the Town Planning Code provides that a building permit, whether tacit or express, may be withdrawn only if it is unlawful and within three months of the date of those decisions. After that period, withdrawal is possible only at the express request of the beneficiary.
The operational consequence is direct. An informal appeal filed in the fifth month of display, in a case where the appeal period only started to run late, may perfectly well be admissible as an administrative appeal within the meaning of L. 411-2, while having no chance of leading to a withdrawal: the administration no longer has the power to do so. The informal appeal then retains its value for the calendar and for evidence, but not its practical usefulness. Anyone relying on a withdrawal must act within three months of the date of the permit, which is a shorter calendar, and a distinct one, from that of the court challenge. The particular case of a permit arising from the administration's silence is dealt with in our article on the three-month withdrawal period for a tacit building permit.
The starting point of the appeal period for third parties: display on the land
The costliest mistake, for an investor as for an institutional neighbour, is to count the appeal period against a building permit from the date of the decision or from its display at the town hall. The text applicable to third parties is Article R. 600-2 of the Town Planning Code:
The time limit for court proceedings against a decision of non-objection to a prior declaration or against a permit to build, to develop or to demolish runs, in respect of third parties, from the first day of a continuous period of two months of display on the land of the documents referred to in Article R. 424-15.
Three points should be noted. The starting point is display on the land, not at the town hall. The display period must be continuous and last two months. And the two-month appeal period runs from the first day of that continuous period, which means that in practice it ends at the close of the two months of uninterrupted display.
Article R. 424-15 requires the beneficiary to display a notice of the permit on the land, visible from the outside, from the notification of the decision or from the point the tacit permit is acquired, and throughout the duration of the works. Article A. 424-18 adds that the board must be installed so that the information remains legible from the public highway or from spaces open to the public throughout the duration of the works. Display at the town hall, provided for by the same R. 424-15, is a separate formality: an extract of the permit published within eight days of its issue, for two months, with the possibility of substituting electronic publication on the municipality's website.
The effects of irregular, interrupted or illegible display on the starting point of the time limit are not settled by these texts. They are a matter for case law and the rules of evidence. Two reflexes are called for, on the side of the objector as on that of the applicant: have the display recorded by a commissaire de justice (bailiff), and date the records. A third party who cannot establish the date of display brings a challenge in uncertainty; a beneficiary who cannot prove it remains exposed well beyond the nominal two-month period.
What the board must say, and why it matters to the objector
Article A. 424-17 sets the wording of the board concerning the right of appeal: the two-month time limit for court proceedings running from the first day of a continuous period of two months of display, and the obligation, on pain of inadmissibility, to notify any administrative or court appeal to the author of the decision and to the beneficiary of the permit, by registered letter with acknowledgement of receipt, within fifteen clear days of the filing of the appeal.
For the addressee of the decision, the rule on enforceability is that of Article R. 421-5 of the Code of Administrative Justice: appeal time limits may be relied upon only if they were stated, together with the available remedies, in the notification of the decision. For third parties, the trigger is display. Two regimes, two calendars, not to be confused where one and the same case involves an applicant challenging a condition attached to their own permit and neighbours challenging the permit itself.
Notification of the informal appeal within fifteen clear days: automatic inadmissibility
This is the point at which most challenges are lost. Article R. 600-1 of the Town Planning Code, in the wording resulting from Decree No. 2019-303 of 10 April 2019, extends the obligation of notification to the administrative appeal:
The author of an administrative appeal is likewise required to notify it, on pain of inadmissibility of the court proceedings that he might subsequently bring if the administrative appeal is rejected.
The penalty does not strike the informal appeal itself: it strikes the subsequent court proceedings. A third party who sends the mayor a reasoned letter, obtains a rejection, and then brings the matter before the administrative court within the time limits will see the application declared inadmissible if the informal appeal was not notified in the proper form. The error is final: no late regularisation can remedy it once the time limit has expired.
The conditions are cumulative and formal:
- notification is made by registered letter with acknowledgement of receipt;
- it is addressed to the author of the decision and to the holder of the authorisation;
- it is made within fifteen clear days of the filing of the appeal;
- it is deemed to have been made on the date the registered letter is sent, that date being established by the certificate of posting of the letter with the postal services.
The rule based on dispatch, and not on receipt, is protective: it secures the objector against postal mishaps. The certificate of posting, which is the means of proof designated by the text, must still be kept. In an investment case, this document should go into the legal file as soon as it is obtained, together with the record of display.
An exclusion was added in 2019: the provisions of R. 600-1 do not apply where a modifying permit, a modifying decision or a regularisation measure is challenged under the conditions laid down in Article L. 600-5-2. The exception is narrow and must not be extended by analogy to a challenge to the original permit. On the choice between a modifying permit, a modifying decision and a new permit, see our analysis of the regularisation of a building permit during proceedings.
The identity of the holder of the authorisation deserves systematic checking. The permit is often issued to a project company, sometimes substituted during the procedure. Notifying the parent company, the architect or the sales developer does not satisfy the obligation. The name and address appearing on the decision and on the board form the working basis.
What the informal appeal extends, and what it does not neutralise
The informal appeal extends the time limit for court proceedings against the initial decision. It produces no other suspensive effect.
It does not suspend the execution of the permit. Work can start, foundations can be poured and the structure can go up while the case remains at the informal appeal stage. For an institutional neighbour whose concern is the usability of its own asset, this asymmetry is decisive: time gained on the appeal period is time lost on the progress of the works, and therefore on the practical usefulness of a future annulment.
It does not prevent the time-bar under Article R. 600-3 of the Town Planning Code, which is the absolute limit for annulment proceedings:
No action seeking the annulment of a building or development permit or of a decision of non-objection to a prior declaration is admissible after the expiry of a period of six months from the completion of the construction or development. Unless proved otherwise, the date of that completion is the date of receipt of the declaration of completion referred to in Article R. 462-1.
This period has been six months since Decree No. 2018-617 of 17 July 2018, applicable to applications directed against decisions made after 1 October 2018. The reference to a period of one year, still frequent in older notes, corresponds to the earlier wording. On a fast build, a roof extension or a light refurbishment, the useful window may close while an informal appeal remains unanswered. Monitoring the date on which the town hall receives the declaration attesting completion and conformity of the works (DAACT) then becomes a point of vigilance in its own right.
It does not reopen the power of withdrawal beyond the three months of Article L. 424-5, as indicated above.
When does the time limit start to run again? The two exit scenarios
The end of the informal appeal stage follows one of two regimes, depending on whether the administration replies or stays silent.
Implied rejection
Article L. 231-4 of the CRPA derogates from the principle that silence amounts to acceptance: silence kept by the administration for two months amounts to a decision of rejection, in particular, under 2°, where the request is in the nature of a complaint or an administrative appeal. An informal appeal against a building permit falls into this category. On the expiry of two months of silence, an implied decision of rejection has arisen.
Article R. 421-2 of the Code of Administrative Justice sets out what follows: the person concerned has a period of two months, to bring proceedings, from the date on which the implied decision of rejection arose. The same article states a point that is often missed:
However, where an express decision of rejection is made before the expiry of that period, it causes the time limit for proceedings to start running afresh.
A mayor who replies late, after the implied rejection has arisen but before the expiry of the following two months, therefore restarts the time limit. This rule works in favour of the attentive objector and traps the one who closed the file on the ground that an implied rejection had already been reached.
Lastly, R. 421-2 imposes a requirement of proof: the date on which the request was filed with the administration, established by any means, must be shown in support of the application. The filing of the informal appeal must therefore be time-stamped and provable, by registered letter or by receipt of filing.
Express rejection
If the administration expressly rejects the informal appeal before the expiry of the two-month period of silence, the time limit for court proceedings starts again from that decision, according to the ordinary two-month period of Article R. 421-1 of the Code of Administrative Justice, subject to the enforceability rule in R. 421-5.
The calendar sequence to follow
For a third party, the complete chronology runs as follows: first day of a continuous period of two months of display on the land, then a two-month period to act or to file the informal appeal, then fifteen clear days to notify that informal appeal by registered letter, then two months of silence amounting to rejection, then two months to bring the matter before the administrative court. The total window for challenging a building permit thus extends considerably beyond the nominal period, without ever crossing the limit in R. 600-3.
The computation itself calls for technical verification case by case. Whether the time limits are clear days or not, the carrying over of expiry dates and the date taken for the filing of the informal appeal do not emerge from the articles cited above and are governed by general rules and case law. In a case with significant stakes, no calendar should be fixed on the sole reading of the texts on time limits.
The procedural cost of the informal appeal: interim suspension and the crystallisation of grounds
This is the central trade-off, and it is rarely raised.
Since the ELAN Act No. 2018-1021 of 23 November 2018, Article L. 600-3 of the Town Planning Code has stated that an appeal directed against a building permit may be accompanied by an application for interim suspension (référé-suspension) only until the expiry of the time limit set for the crystallisation of the grounds raised before the court seised at first instance. The same article presumes that the condition of urgency in Article L. 521-1 of the Code of Administrative Justice is met. Where a person other than the State, the commune or the EPCI accompanies its appeal with an application for suspension, the judge hearing the interim application rules within one month.
Article R. 600-5 sets the cut-off point: the parties may no longer rely on new grounds after a period of two months from the communication to the parties of the first statement of defence. This crystallisation is automatic, subject to the power of the president of the trial panel to set a new date where the judgment of the case justifies it, and the text does not apply to decisions challenged by the applicant.
The strategic consequence is clear. The interim suspension application is not open throughout the proceedings: it closes shortly after the registration of the application and the exchange of the first statement of defence. Yet the presumption of urgency makes it the most effective tool for stopping a building site. Anyone who spends four to six months on an informal appeal phase starts litigation when construction is already well advanced, and approaches the question of suspension in a degraded factual context. Conversely, direct court proceedings, accompanied from the outset by an interim suspension application, place the applicant under immediate constraint. How the interim suspension application fits with the main proceedings is developed in our article on the offensive strategy for challenging a building permit.
The time taken to judgment on the merits points the same way. Article R. 600-6, in the wording resulting from Decree No. 2022-929 of 24 June 2022, which came into force on 1 September 2022, requires the judge to rule within ten months on appeals against permits to build a building comprising more than two dwellings, against permits to develop a subdivision, or against decisions refusing to grant those authorisations, the administrative court of appeal ruling within the same period. For these categories of project, the litigation is constrained in time: deferring the bringing of proceedings by means of an informal appeal mechanically pushes back the date of judgment.
Preparing the admissibility of the proceedings when drafting the informal appeal
The informal appeal does not cure the conditions of admissibility of the court proceedings. It does, however, allow them to be tested and documented in advance.
The standing of third parties to bring proceedings is governed by Article L. 600-1-2, in the wording resulting from the ELAN Act applicable since 1 January 2019. A person other than the State, local authorities or their groupings, or an association, is admissible to bring an application for judicial review (excess of powers) against a decision relating to the occupation or use of land governed by the Town Planning Code only if the construction, development or authorised project is likely directly to affect the conditions of occupation, use or enjoyment of the property that it holds or lawfully occupies or for which it benefits from a promise of sale, a lease, or a preliminary contract referred to in Article L. 261-15 of the Construction and Housing Code. The text does not apply to decisions challenged by the applicant.
Article R. 600-4 translates this requirement into documents. Applications must, on pain of inadmissibility, be accompanied by the title deed, the promise of sale, the lease, the preliminary contract, the tenancy agreement, or any other document capable of establishing the lawful nature of the occupation or holding of the property. For an association, the articles of association and the receipt attesting its declaration at the prefecture are added. Article L. 600-1-1, in the ELAN version, also makes the admissibility of an association subject to the filing of its articles of association at the prefecture at least one year before the display at the town hall of the applicant's request. The earlier wording referred to a filing prior to the display, with no condition as to duration: the one-year prior condition is now a filter to be checked before any action by an association.
For an investor structured through a project company or through a dismemberment of ownership, the question arises beforehand: which entity holds the title justifying standing, and is its title enforceable on the date of the challenge. The informal appeal is the right moment to establish this, not the eve of filing the application.
Two provisions, finally, govern the conduct of the objector. Article L. 600-7, in the version resulting from the ELAN Act, allows the beneficiary of the permit to apply, by separate statement, for the applicant to be ordered to pay damages where the right of appeal is exercised in conditions that reflect abusive conduct on the part of the applicant and that cause harm to the beneficiary of the permit, the claim being capable of being made for the first time on appeal. Article L. 600-8 requires the registration, in accordance with Article 635 of the General Tax Code, of any transaction by which a person who has applied or who intends to apply for the annulment of a permit undertakes to withdraw or not to bring proceedings in return for consideration. Failing registration within one month, the consideration is deemed to be without cause and the sums paid are subject to recovery, the action being time-barred after five years. The wording referring to the intention to apply for annulment expressly covers agreements concluded at the informal appeal stage, before any application to the court.
The trade-off: informal appeal or direct application to the court
The informal appeal is justified where the alleged illegality can be regularised by the administration, where the technical file is not yet consolidated and the additional time is used to prepare it, or where a negotiation with the applicant is conceivable, subject to the requirements of L. 600-8. It is also justified where the aim is to obtain disclosure of the permit file and to identify the grounds before committing.
It backfires on its author where the works are imminent or under way, where the project falls within the categories subject to the ten-month judgment period in R. 600-6 and the aim is to block quickly, or where the window under R. 600-3 is short in relation to the foreseeable duration of the works. In those configurations, the time consumed in the informal appeal phase is paid for by the loss of useful access to the interim suspension application under L. 600-3.
Conclusion
The informal appeal against a building permit is not a courtesy step: it is an act that redefines a calendar and that, if badly executed, permanently closes access to the court. Three truths should guide the decision. The time limit runs from display on the land, not from the decision. Notification by registered letter within fifteen clear days is a condition, on pain of inadmissibility, of the subsequent court proceedings. And time gained on the time limit is time lost on the interim suspension application, which closes when the grounds crystallise.
Our position is clear: on a project already under construction or on a permit for a building of more than two dwellings, a direct application to the court accompanied by an interim suspension application almost always prevails over the informal appeal route. The informal appeal remains relevant where an administrative regularisation is plausible or a negotiation is open. Before any decision, have a dated record of the display on the land drawn up by a commissaire de justice, and have the standing of the entity that will bring the appeal checked against the documents: these two steps, taken in the first few days, determine the whole of the sequence that follows.
Frequently asked questions
Does the informal appeal suspend the time limit for court proceedings, or does it extend it? Article L. 411-2 of the CRPA provides that an informal or hierarchical appeal, made within the time limit allowed for bringing court proceedings, interrupts the running of that time limit. The effect is therefore interruptive: a new full time limit, and not a remainder, will start to run when the administrative appeal has been rejected. If an informal appeal and a hierarchical appeal are made within the initial time limit, the time limit for court proceedings starts to run again in respect of the initial decision only once both have been rejected.
From when does a neighbour's appeal period against a building permit run? Article R. 600-2 of the Town Planning Code sets the starting point at the first day of a continuous period of two months of display on the land of the documents referred to in Article R. 424-15. Neither the date of the decision nor display at the town hall triggers the time limit in respect of third parties. The board must remain legible from the public highway or from spaces open to the public throughout the duration of the works (Article A. 424-18). In practice, proof of the continuity and legibility of the display is built up through dated records by a commissaire de justice.
Must an informal appeal be notified to the holder of the building permit? Yes. Article R. 600-1 of the Town Planning Code, in the wording resulting from Decree No. 2019-303 of 10 April 2019, requires the author of an administrative appeal to notify it, on pain of inadmissibility of the court proceedings that he might subsequently bring if it is rejected. Notification is made by registered letter with acknowledgement of receipt, to the author of the decision and to the holder of the authorisation, within fifteen clear days of the filing of the appeal. It is deemed to have been made on the date of dispatch, established by the certificate of posting with the postal services. These provisions do not apply to the challenge of a modifying permit, a modifying decision or a regularisation measure within the meaning of Article L. 600-5-2.
What happens if the town hall does not reply to the informal appeal? Silence kept for two months amounts to a decision of rejection, under Article L. 231-4, 2°, of the CRPA, which covers requests that are in the nature of a complaint or an administrative appeal. Article R. 421-2 of the Code of Administrative Justice then opens a period of two months from the date on which the implied decision of rejection arose. The same text states that where an express decision of rejection is made before the expiry of that period, it causes the time limit for proceedings to start running afresh. The date on which the appeal was filed with the administration must be shown in support of the application.
Can a building permit still be challenged once the works are completed? Article R. 600-3 of the Town Planning Code, in the wording resulting from Decree No. 2018-617 of 17 July 2018, bars any action for annulment on the expiry of a period of six months from the completion of the construction or development. Unless proved otherwise, the date of completion is the date of receipt of the declaration of completion referred to in Article R. 462-1. These provisions apply to applications directed against decisions made after 1 October 2018. The reference to a period of one year corresponds to the earlier wording of the text.
Does an informal appeal cost the benefit of the interim suspension application? Indirectly, yes, if the informal appeal phase consumes too much time. Article L. 600-3 of the Town Planning Code, resulting from the ELAN Act No. 2018-1021 of 23 November 2018, allows the interim suspension application only until the expiry of the time limit set for the crystallisation of grounds before the court of first instance, while presuming that the condition of urgency is met. Article R. 600-5 sets that crystallisation at two months after the communication to the parties of the first statement of defence. The interim application is therefore not open throughout the proceedings, and the works are never suspended by the sole effect of the informal appeal.
Can the administration withdraw the permit at the request of a third party? Only within a narrow window. Article L. 424-5 of the Town Planning Code provides that the permit, tacit or express, may be withdrawn only if it is unlawful and within three months of the date of the decision. After that period, withdrawal is possible only at the express request of the beneficiary. An informal appeal made after three months may therefore retain an effect on the litigation calendar without any chance of obtaining a withdrawal.
The simulator below tells you which planning permission is required, the processing times, the appeal deadlines and how long the permit remains valid.
Quatre questions suffisent à situer votre position, le délai qui vous reste et ce qu'il faut vérifier en priorité. Vous décidez ensuite si vous en parlez au cabinet.
Décrire ma situationA question about your own situation?
The firm assists business owners, investors and private individuals, from upstream advice through to litigation.








